Our scope: everything in the data center - power, cooling, cabinets, fire protection - integrated into a turnkey system, prefabricated to your needs. Your scope: the silicon and the shell. That is the whole division of labor.
A complete Power Dynamics system is built across four integrated layers. Each one manufactured in-house. None of them dependent on a vendor we do not control.
Bring your own energy. Immersion-cooled BESS from 15 kW to 5 MW / 10 MWh, integrated with solar, wind, gensets, or the grid. Cells held within 2°C live 30% longer. Storage that arbitrages, firm renewables, and sells grid services while your compute runs.

Sealed-tray single-phase immersion, cold plate, or air - and hybrids that upgrade over time. PUE 1.05-1.10 where air cooling fails at 30 kW per rack. Zero fire risk, zero water consumption, and 85% of the heat captured as a sellable product instead of a bill.

Prefab containers that are the data center: 20ft and 40ft integrated edge units, AIDC modules with IT cabinets, UPS power distribution, MV skids, generators, cooling towers. 10.8 kW/m² density, IP55, road or sea transport, ground installation on concrete or steel base.

The AI-powered EMS that runs the other three as one machine: predictive balancing from 15 minutes to 72 hours ahead, single-cell monitoring, remote cell-level shutdown, automated grid-services participation. Designed and built to be handed over to your team.
Power, cooling, and compute talk to each other through one control layer - and the waste of one becomes the input of another. RUHE (Re-Utilization of Heat Emissions) closes the loop.
At an LNG terminal, regasification throws away cold. We route it to the data center instead. A 10 MW facility with LNG cold energy covering 50% of cooling drops PUE from 1.3 to 1.18 - and to 1.095 at 100% coverage.
The data center's captured waste heat does the vaporization work the terminal would otherwise burn fuel or seawater pumps for. On-site gas generation adds a third tier: waste heat from the gensets joins the loop.
The prefab method compresses the schedule because manufacturing and site work happen at the same time.
We start from your load profile, site, power source, and sovereignty constraints - coverage, capacity, cooling architecture, upgrade path. No template answer survives contact with a real site plan.
Energy, thermal, and compute layers designed together, end to end, by one engineering org. No handoffs between vendors means no losses between the gaps.
Prefab equipment built and pre-tested at our 230,000 m² campus while your site is prepared. 16 UL-certified facilities, 12 GWh of annual BESS capacity.
Plug-and-play installation, one month of testing, and your team takes operational control with the EMS. We stay on under support contract. Total: 6-9 months + 1 month testing, versus 18+ traditional.

You have the GPUs, the offtakers, and the capital. What you do not have is 140 kW-per-rack thermal headroom and a grid queue that clears in 2029. We deliver the energy and thermal envelope in 6-9 months, upgradeable as the silicon generation turns - so your facility never strands.

Utility-scale BESS in cold-plate or immersion, 5 MW / 10 MWh blocks, firming renewables and selling frequency regulation, spinning reserve, and balancing. Immersion-cooled cells hold within 2°C - degradation stops eating your IRR. 600 MW+ already delivered to China Southern Power Grid.

Sealed-tray immersion means a rack you can service without draining a tank - colo SLAs survive the retrofit. 264% space efficiency versus air-cooled lets you sell capacity you did not have. Noise at or under 62.6 dB keeps you inside urban limits.

Branch offices, smart city nodes, university research clusters, oil and gas fields, ports, backup data centers. The 20ft integrated container arrives with cooling, UPS, and battery backup inside one IP55 box - compute where you need it, on the power you have.